Skip to content
Semiconductor

Large-scale Semiconductor Metal Frame — Project Gallery

A semiconductor equipment frame project demonstrating ACE's robot welding, tenon joint integration and post-weld heat treatment workflow. Post-welding flatness held at ±0.1mm. Process scope: tube cutting, welding, heat treatment, CNC machining, sandblasting and powder coating.

Large-scale welded semiconductor metal frame — robot welding + tenon joints + ±0.1mm flatness — ACE Sheet Metal Suzhou
Robot-welded tube structure with tenon joints — ACE Sheet Metal
Frame after post-weld heat treatment showing flatness control — ACE Sheet Metal

Have a similar project?

Send drawings or RFQ to our engineering team — we will reply with a DFM review or quotation.

keyboard_arrow_up