Semiconductor
Large-scale Semiconductor Metal Frame — Project Gallery
A semiconductor equipment frame project demonstrating ACE's robot welding, tenon joint integration and post-weld heat treatment workflow. Post-welding flatness held at ±0.1mm. Process scope: tube cutting, welding, heat treatment, CNC machining, sandblasting and powder coating.
Large-scale Metal Frame
Large-scale semiconductor metal frame assembled and inspected
Robot-welded Tube Structure
Robot-welded tube structure with tenon joints
Post-weld Heat Treated Frame
Frame after post-weld heat treatment showing flatness control
Have a similar project?
Send drawings or RFQ to our engineering team — we will reply with a DFM review or quotation.